Town House Development
This project was situated on a sloped 2300m2 site with a tennis court in the middle. The tennis court pre-cast panel retaining walls were constructed on site, footings were excavated, panels erected and then the site was excavated to the required levels. Townhouse panels were fabricated off site with some components made on site.